The New Jersey Institute of Technology's
Electronic Theses & Dissertations Project

Title: The design and implementation of a time-shared computer based construction cost estimating system for an electric utility
Author: Westphal, Thomas Arnold
View Online: njit-etd1974-005
(240 pages ~ 10.3 MB pdf)
Department: Department of Industrial and Management Engineering
Degree: Master of Science
Program: Management Engineering
Document Type: Thesis
Advisory Committee: Goldstein, Irving R. (Committee chair)
Date: 1974
Keywords: Building --Estimates.
Electric power-plants --Costs.
Electric power-plants --Design and construction.
Availability: Unrestricted
Abstract:

The work of the distribution department of an elec tric utility involves a great deal of medium to heavy construction. This work is vital to serve the energy needs of the public. An electric utility constantly builds, reinforces, and repairs electric distribution facilities. The material and labor used to accomplish this construction is expensive. Money in sufficient amounts is seldom, if ever, available to finance all proposed construction projects. Therefore, the cost of proposed projects must be estimated in advance, so that management may decide on an economic basis which projects will be authorized.

The need for accurate construction cost estimates is imperative to the economic operation of an electric utility. This thesis delves into the problem of the design and implementation of a computer based cost estimating system to insure the accuracy and timeliness of estimates.

In order to accomplish the design, a series of eight main program modules was written in the BASIC language for use on the General Electric Mark III foreground system. These programs access individually tailored sequential and random disk files using third generation real time computer techniques. The system was made available to eight field locations via remote terminal facilities. The immediacy and flexibility of the time sharing environment proved to be valuable selling points in the implementation of the new system.

At this writing, the new estimating system has met with the approval of the field project engineers, and is well on the way to replacing the manual system. Input simplification has enabled the company to use less technically skilled personnel for the estimating function, with resulting cost savings. Results thus far far have shown the system to be flexible, timely, and accurate.


If you have any questions please contact the ETD Team, libetd@njit.edu.

 
ETD Information
Digital Commons @ NJIT
Theses and DIssertations
ETD Policies & Procedures
ETD FAQ's
ETD home

Request a Scan
NDLTD

NJIT's ETD project was given an ACRL/NJ Technology Innovation Honorable Mention Award in spring 2003